An EV charger stops working in an apartment car park. The resident calls the building manager, who contacts the electrician. The electrician checks the installation and finds no obvious electrical fault. The charger appears online, but the resident still can't start a session.


Who takes responsibility for getting it working again?


In a NSW strata building, EV charger maintenance depends on who owns the equipment, how the shared infrastructure is managed and what the relevant agreements say.


The owners corporation typically oversees common-property charging infrastructure. Individual owners are generally responsible for their own charging stations, while software providers or electrical contractors may be engaged to maintain specific parts of the system.


The difficulty comes when a fault involves more than one of those parties.


Who is responsible for maintaining EV chargers in strata?


An apartment charging system can include privately owned chargers, shared distribution boards, electrical cabling and a building-wide load management platform.


These components may have different owners and maintenance arrangements.


Diagram showing responsibility for shared and individual EV charging infrastructure

The NSW Government's EV-ready apartment guidance confirms that responsibility depends on the ownership and management model.


The following table shows how responsibilities are commonly divided.


Equipment or function

Typical responsibility

Shared electrical backbone, distribution boards and cabling

Owners corporation

Shared visitor or communal chargers

Owners corporation or appointed operator

Privately owned charger serving an individual lot

Lot owner, subject to applicable arrangements

Building-wide load management system

Owners corporation or contracted service provider

Charging software and user accounts

Account holder or appointed platform operator

Fault reporting and contractor access

Building or strata manager, as authorised

These are typical arrangements, not a substitute for reviewing the building's strata plan, by-laws and contracts.


Under NSW strata maintenance rules, the owners corporation generally has responsibility for common-property repairs and maintenance. However, the precise boundary between lot property and common property can require closer examination.


For example, a resident may own the charger mounted at their parking space while the electrical supply comes through a backbone owned by the owners corporation.


If the charger fails, the resident may be responsible for repairing it. If the fault originates in shared electrical equipment, the owners corporation may need to arrange the repair instead.


A building manager can coordinate access and contractor attendance without personally undertaking electrical work.


What maintenance does an EV charging system need?


A maintenance plan should cover the charging hardware, supporting electrical infrastructure and any management software.


1. Chargers and electrical equipment


EV charging equipment can develop faults through normal use, physical damage, environmental exposure or electrical component failure.


Depending on the installation, maintenance may include:


  • Visual inspections for damaged charging cables, connectors or enclosures.

  • Checking protective devices and electrical connections where appropriate.

  • Investigating reported charging faults or abnormal operation.

  • Testing and servicing in accordance with manufacturer instructions.

  • Reviewing the condition of shared distribution equipment and associated infrastructure.


Any work involving electrical wiring or repair must be carried out by appropriately licensed personnel.


The NSW Government's electrical compliance guidance explains the applicable Certificate of Compliance for Electrical Work (CCEW) requirements.


Buildings should retain the relevant electrical documentation and test records as part of their infrastructure records.


2. Dynamic load management


Where several chargers share limited electrical capacity, a dynamic load management system controls charging demand.


This allows multiple vehicles to charge without simply allocating the maximum possible output to every charger at the same time.


Maintenance therefore extends beyond individual charging stations.


The building needs to know whether the load management system is communicating correctly with connected equipment, whether operating limits remain appropriate and who can change the configuration.


If additional chargers are installed, the system may need to be reviewed to accommodate the new connections.


Our guide to dynamic load management for strata EV charging explains the electrical planning considerations in more detail.


3. Charging software and connectivity


Many shared EV charging systems use a management platform to authorise users, record charging sessions, manage electricity demand or support billing.


A charger may be electrically functional but unavailable to a resident because of a software, account or communications issue.


The building should know who is responsible for maintaining connectivity, managing administrator access, applying updates and resolving platform faults.


These responsibilities may sit with a software provider rather than the electrical installer.

That distinction should be clear in the support agreement.


How often should EV chargers be serviced?


There is no single maintenance interval that should automatically be applied to every EV charger in a NSW strata building.


The appropriate schedule depends on the manufacturer's requirements, equipment type, installation environment, usage and applicable electrical safety obligations.


A shared charger in a busy visitor parking area may need closer attention than a privately owned charger serving one resident.


The Australian Government's guidance for owners corporations recommends regular inspection, software updates, troubleshooting and appropriate maintenance planning.


For strata committees, the practical approach is to obtain the manufacturer's servicing recommendations and have a qualified contractor identify what inspections and testing the particular installation requires.


The resulting maintenance schedule should identify who arranges each activity and who keeps the records.


Avoid assuming that a warranty or software subscription automatically includes physical inspections or electrical servicing.


What happens when an EV charger stops working?


Consider a Sydney apartment building with 20 charging stations connected through shared electrical infrastructure.


EV charger fault reporting and troubleshooting workflow for strata buildings

One resident reports that their charger will not start. Other residents are charging normally.

The building manager needs a clear reporting procedure so the problem reaches the right person.


Scenario 1: One charger is offline


The fault may involve the charging unit, its electrical supply or its network connection.

The appointed support provider may first check the device's status remotely.

If an electrical fault is suspected, a qualified technician may need to attend.


Scenario 2: The charger is online but won't start a session


The problem may involve user authorisation, account settings, a charging management platform or communication between systems.

An electrical contractor may find that the charger itself is operating normally.

The next investigation may need to be handled by the software provider.


Scenario 3: Several chargers become unavailable


If multiple chargers stop working together, the fault may involve equipment shared between them.

That could include communications, a distribution circuit or the load management system.

The response should identify whether the issue is electrical or software-related before work is allocated.

If a charger or cable shows signs of damage, overheating or another safety concern, it should not be used until assessed by an appropriately qualified person. Residents and building staff should never bypass electrical protection or attempt unauthorised repairs.


A fault-reporting process for strata buildings


Residents should have one clear place to report charging problems, even when different contractors are responsible for repairs.


The reporting process should capture the charger location, the reported problem, the time of the incident and any error information visible to the user.


From there, the building manager or nominated operator can direct the report to the appropriate provider.


A maintenance contract should establish response arrangements, escalation contacts and which services are charged separately.


Without this information, contractors can spend more time determining responsibility than identifying the fault.


What documents should a strata building receive after installation?


An EV charging installation should be handed over with enough information for the owners corporation to operate and maintain the system.


This becomes particularly important when a building manager changes, additional chargers are installed or the original contractor is no longer available.


The handover package should include:


Document or information

Why the building needs it

As-installed electrical drawings and relevant circuit information

Helps contractors identify equipment and electrical connections

Applicable CCEWs and test records

Documents the completed electrical work and compliance process

Equipment register, models and serial numbers

Identifies installed hardware and replacement components

Manufacturer instructions and warranties

Establishes servicing requirements and warranty conditions

Load management configuration

Records system operating limits and relevant settings

Software administration details

Enables authorised management of the charging platform

Maintenance and support contacts

Identifies who handles faults and ongoing service

Resident operating instructions

Provides a consistent process for using and reporting issues with chargers


The Australian Government's installation guidance recommends confirming that chargers operate correctly and communicate with load management and billing systems before accepting the installation.


It also recommends informing the building's insurer after EV chargers have been installed.


For buildings still selecting a contractor, our article on what a strata EV charging installation quote should include explains which project requirements should be documented before work starts.


Who pays for EV charger maintenance and repairs?


Ongoing maintenance costs should be considered separately from the electricity used to charge vehicles.


For example, a building might charge residents individually for their electricity consumption while paying for shared infrastructure maintenance through an owners corporation budget.


An individual charger owner may pay to repair their own equipment.


A contracted charging operator may provide software support under a subscription, but that subscription might exclude replacement hardware or on-site electrical repairs.


Before agreeing to an arrangement, the strata committee should check:


  • Who pays for servicing shared infrastructure?

  • Are software support and physical repairs included in the same agreement?

  • Which parts and labour are covered by warranty?

  • Who pays when a technician attends but finds no fault with the equipment covered by their contract?

  • How are major component replacements approved and funded?


Cost allocation should be consistent with the building's ownership arrangements, by-laws and applicable contracts.


For a detailed explanation of electricity charges and infrastructure cost recovery, see our separate guide to EV charging payment models for strata buildings.


Can a strata building change its EV charging software provider?


This is worth checking before the building becomes dependent on a particular platform.


Charging hardware may remain installed for years, while software subscriptions or service contracts change.


A committee considering a new provider should establish whether the installed chargers support the proposed platform, who holds the administrator credentials and what is involved in transferring the equipment.


The Open Charge Point Protocol (OCPP) is designed to support communication between charging stations and central management systems.


According to the Open Charge Alliance, OCPP supports interoperability between equipment and management platforms from different vendors.


However, OCPP support alone does not guarantee that every charger will work with every platform or that all functions will transfer unchanged.


Compatibility depends on the hardware, firmware, supported protocol version and software implementation.


Before changing providers, the building should confirm that its existing equipment can be supported, and establish how user accounts, billing records and system settings will be handled during the transition.


The same questions are worth asking before the original platform is purchased.


What should an owners corporation do if the system is already installed?


Some buildings have chargers operating without a formal maintenance agreement or a complete set of installation records.


That can be addressed without automatically replacing the existing equipment.


A useful starting point is to establish what equipment the building has, who owns it and which contractors currently have access to its electrical and software systems.


The strata committee can then review the available documentation and arrange for any gaps to be assessed.


The priorities are straightforward:


  1. Confirm who is responsible for each part of the charging system.

  2. Obtain missing operating, warranty and electrical documentation where available.

  3. Establish a maintenance schedule appropriate to the installed equipment.

  4. Agree on a fault-reporting process and authorised service contacts.

  5. Review support contracts, software access and ongoing charges.


For shared charging installations, the maintenance arrangements should also be reflected in the building's operating procedures.


Our guide to strata EV charging by-laws and usage policies explains how those documents serve different purposes.


Planning EV charging for your Sydney strata building


For a new installation, maintenance arrangements should be agreed before commissioning and handover.


For an existing system, reviewing the equipment records, ownership responsibilities and support arrangements can help identify gaps before the next fault occurs.


VeCharge Australia works with strata managers and owners corporations across Sydney on electrical assessments, EV charging infrastructure planning and installation.


If your building is considering an EV charging project, we can discuss how equipment selection, system management and handover requirements should be addressed in the proposed scope.


Contact VeCharge at info@vecharge.com or call 1300 315 688.


This article provides general information for NSW strata communities and is not legal or electrical engineering advice. Maintenance responsibilities depend on equipment ownership, strata by-laws, contractual arrangements and applicable regulations.

 
 
bottom of page