Who Can Install EV Chargers in NSW Strata Buildings? What to Check Before Hiring
Yes, an appropriately licensed electrician can install an EV charger in an NSW apartment building. A specialist EV charging company is not automatically required by law.
The more useful question for a strata committee is whether the contractor's proposed scope matches the building's electrical infrastructure and the installation being considered.
Connecting one charger to suitable existing infrastructure can be a relatively straightforward job. Installing shared charging infrastructure for multiple residents may also require capacity assessments, load management, metering, common-property approvals and ongoing system support.
Before choosing an EV charging installer, a committee should establish who is authorised to carry out the electrical work, what has been assessed and exactly what the quotation includes.

Can a Licensed Electrician Install an EV Charger in an Apartment Building?
For some buildings, a local electrical contractor may be entirely suitable.
The NSW Government's residential strata EV charging guidance describes an individual installation approach that can usually be completed by a local electrician. This may suit a smaller building where a resident's meter is accessible, sufficient electrical capacity is available and the proposed cabling route is practical.
Other buildings have different requirements.
A parking space may be several levels away from the switchboard. Multiple residents may want chargers supplied through shared infrastructure. The owners corporation may need to decide how charging demand, electricity consumption and future connections will be managed.
In these situations, the installation may involve more than connecting an individual charging unit.
That does not necessarily mean appointing a different type of electrician. An experienced electrical contractor may have the capabilities required for the entire project or work with other professionals where necessary.
The committee's job is to confirm that those capabilities and responsibilities are included in the proposal.
What Qualifications and Compliance Documents Should You Check in NSW?
Electrical licensing
NSW law requires electrical wiring work to be carried out by, or under the supervision of, an appropriately licensed electrician.
There are different licensing arrangements for contracting to perform electrical work, carrying it out and supervising it.
Before appointing a provider, ask who will contract for the electrical installation and who will carry out or supervise the work.
Licence details can be verified through the Service NSW licence check.
A valid electrical licence establishes legal authorisation for the relevant electrical work. It does not automatically establish experience with shared charging systems, multi-level car parks or building-wide electrical infrastructure.
Ask for examples of comparable completed projects and which parts of those projects the contractor actually delivered.
Electrical compliance documentation
Electrical installation work in NSW is subject to relevant legal requirements and standards, including the Australian/New Zealand Wiring Rules, AS/NZS 3000.
Following the required electrical testing, a Certificate of Compliance for Electrical Work (CCEW) must be submitted. Under Building Commission NSW's requirements, the person carrying out the electrical test must submit the certificate as soon as practicable, no later than seven days after the test.
Since 1 July 2026, CCEWs have been submitted electronically through BCNSW eCert.
The quotation should identify who is responsible for testing, certification and providing the owners corporation with the relevant handover documentation.
A CCEW is not a substitute for strata approval or any applicable electricity network requirements. These are separate matters.
When an Accredited Service Provider may be needed
Some larger projects involve changes to the building's electricity supply or work associated with the distribution network.
Specified contestable network services in NSW must be performed by an appropriately accredited provider under the NSW Accredited Service Provider (ASP) Scheme.
However, an ASP is not automatically required for every apartment EV charger installation.
If the proposal involves a supply alteration or network-related work, ask the contractor to explain what is required, who will carry it out and whether those costs are included.
When Does Strata EV Charging Need a Wider Building Assessment?
The scope should reflect the charging arrangement being proposed.
Installation scenario | What the committee should establish |
One charger using suitable existing infrastructure | Connection point, electrical capacity, cabling route, required approvals and compliance documentation |
Several chargers using shared electrical capacity | Available demand, charging limits, load management, metering and coordination between users |
Building-wide charging infrastructure | Overall electrical assessment, distribution design, staged connections, billing, ownership and ongoing support |
These are illustrative scenarios rather than fixed technical categories. The same building may have several suitable installation approaches.
For a wider rollout, NSW Government guidance recommends a building energy assessment that considers existing circuit breaker sizes, historical peak demand, usage patterns and spare electrical capacity.
The purpose is to establish what the building can support before selecting the infrastructure.
For example, a proposal for several chargers should explain whether their expected demand can be accommodated within the available supply. If dynamic load management is proposed, the committee should understand which loads it monitors, how charging power is controlled and what happens when the available capacity is limited.
Load management can help a building use its available capacity, but it cannot guarantee that electrical upgrades will be unnecessary.
For a more detailed explanation, see the guide to Dynamic Load Management.
Metering also affects the design. A charger connected to an individual apartment's meter may be billed through that resident's electricity account. A shared charging system may require separate usage measurement, a billing arrangement and administration of ongoing costs.
These models are examined in our strata EV charging payment guide.
The assessment should help determine which arrangement suits the building rather than assume that every property needs the same technology.
What Should Be Included in an EV Charging Installer's Quote?
Two installers may quote for the same number of chargers while proposing very different work. One quotation might include the charger, cabling and electrical installation. Another might also include a building assessment, distribution equipment, management software and coordination of approvals.
Neither is automatically better. The question is whether the quotation covers the work the building actually needs.

Use the following comparison when reviewing proposals.
Item to compare | What to look for in the quotation |
Electrical assessment | Whether capacity has been assessed, what evidence supports the design and whether further assessment is excluded |
Installation scope | Charger models, electrical connection, cabling routes, distribution equipment, commissioning and any building reinstatement |
Load management | Whether required, what is included, the operating limits and any software or communications dependencies |
Metering and billing | How individual electricity use is measured, who administers billing and what ongoing charges apply |
Approvals and network work | Which approvals are identified, who obtains them and whether network-related services are included |
Compliance and handover | Testing, CCEW responsibilities, drawings, operating instructions and other agreed deliverables |
Future connections | What infrastructure is installed now and what additional work may be needed for the next charging point |
Maintenance and support | Warranty scope, fault reporting, support responsibilities, recurring fees and exclusions |
The important distinction is between work that has been included, work that has been assumed and work that will be priced separately.
A quotation stating "switchboard upgrade if required" leaves an important question unanswered: has the existing capacity been assessed, or will that decision only be made after the project begins?
Similarly, "future-ready infrastructure" should describe something specific.
Does the current project include cable pathways, spare distribution capacity or a charging management system that can support later connections? Or does it simply mean that additional work may be possible in future?
The committee should ask for the proposed infrastructure and its limitations to be documented.
A clear quotation makes the responsibilities visible before the contract is signed.
Eight Questions to Ask Before Appointing an EV Charging Installer
A strata committee does not need to evaluate the electrical design itself. It does need enough information to assess the proposal and understand who is responsible for each stage.
Can we verify the appropriate electrical licences, and who will perform or supervise the work?
What comparable strata EV charging projects have you completed, and what was your role?
What assessment supports the proposed charging capacity, and can we receive its findings?
Which assumptions could change the quoted scope or price after the site is inspected?
Who is responsible for common-property approvals, network applications and any specialist subcontractors?
What testing, compliance records, drawings and operating instructions will we receive at handover?
Who will manage metering, billing, software access, maintenance and faults after installation?
If another resident requests a charger later, what additional infrastructure, approval or expenditure might be needed?
These questions are useful whether the committee is considering a local electrical contractor, an EV charging specialist or a provider offering a complete project service.
What a Real Strata Project Can Tell You About Installer Scope
Our Altair Apartments EV charging project illustrates why building conditions can change the work required. The Sydney project involved charging infrastructure across a multi-level residential car park with 159 parking spaces. We undertook a feasibility assessment with an electrical engineer before determining the infrastructure approach. The published scope included new distribution equipment, cable pathways across three car-park levels, dynamic load management and a platform for managing charging and billing.
Those elements formed part of the wider infrastructure project. They would not necessarily be relevant to a resident installing one charger in a building with a suitable existing connection.
The useful lesson for a committee is to establish the project's actual requirements before comparing the proposed price and equipment.
Choosing the Right EV Charging Provider for Your Building
For a relatively straightforward individual installation, an appropriately licensed electrical contractor with relevant experience may be the right choice.
For a more complex shared system, the owners corporation may want a provider that can coordinate assessment, design, electrical installation, commissioning and ongoing operation. Some of these functions may be delivered through suitably qualified subcontractors or consultants.
Either arrangement can be appropriate.
What matters is whether the proposal identifies the people responsible, the work included and the evidence supporting the recommended solution.
Before accepting a quotation, a committee should be able to explain what the building is buying, which limitations remain and who will handle the next stage if conditions change.